1996 |
- Obtained ISO14001 certification (Numazu office)
|
- Automatic cutoff equipment was installed at the final outlet. (Numazu office)
|
1997 |
- Started hexavalent chromium monitoring (Numazu office)
- Obtained ISO14001 certification (Gotemba office, Sagami office)
- Established a new environment voluntary plan.
|
- An observation well of hexavalent chromium was built. (Numazu office)
- Heat treat furnace was abandoned. (Sagami office)
- Scrubber for semiconductor was renewed. (Numazu office)
- Soundproof walls were established. (Transformer station at Numazu office)
|
1998 |
- Certified as an environment management business office in Kanagawa Prefecture (Sagami office)
- Conducted an overall environmental inspection (groundwater and soil survey) (Numazu office, Gotemba office, Sagami office)
- Started chlorinated organic solvent monitoring (3 substances) by observation well (Numazu office)
|
- 2-step treatment was realized at the process flow wastewater treatment plant. (Sagami office)
- Electric vacuum car was employed.
- Process method of activated sludge from drainage from the canteen was improved. (Sagami office)
- Upper stream monitoring equipment was installed. (Oily water separating tank at Numazu office)
- PH meter was set at the final outlet of the process flow wastewater treatment plant. (Sagami office)
|
1999 |
- Won the Grand Prix of the Electricity Use Rationalization Committee award. (Sagami office)
- Employed a uniform of PET bottle recycling.
- Won the governor’s award for distinguished performance in proper industrial waste treatment. (Head Office Plant)
- Integrated the ISO14001 certification (Head Office Plant and Gotemba Plant)
|
- Waste incinerator was abandoned (Head Office Plant)
|
2000 |
- Started issuing “Environment Report”.
- Integrated the ISO14001 certification. (Head Office Plant, Gotemba Plant and Sagami Plant)
- Started shifting to chlorine-free cutting fluid in full scale.
- Established the third environment voluntary plan.
|
- Street lights were replaced with sodium lamps.
- Drying equipment for mold was replaced with indirect gas hot air generator. (Head Office Plant)
|
2001 |
- Prepared “Green Procurement Guideline” and started a survey of green procurement suppliers.
- Received a letter of appreciation for the voluntary forestation activity.
|
- Realized a dual structure for the buried part of hydraulic oil pipeline and pipe protection with U-shaped gutter.
- Low frequency noise sensor was installed. (Head Office Plant, Foundry)
|
2002 |
- Established an environment-friendly product design guide.
- Won the governor’s award in Shizuoka Prefecture for distinguished performance in environment conservation (Head Office Plant)
- Extended the scope of the ISO14001 certification (Toei Electric, Co., Ltd, Fujiseiki Corporation)
- Held an explanatory meeting for local residents at a private viewing. (Head Office Plant)
|
- Oil protective barriers were built. (the process flow wastewater treatment plant at Sagami Plant)
- The waste stations were integrated and RC station was established. (Head Office Plant)
- Sprinklers and protective barriers were installed at the high pressure gas storage.
- Emergency exhaust equipment was installed at the cylinder cabinet.
|
2003 |
- Extended the scope of the ISO14001 certification (Toshiba Machine Molding Engineering)
- Started participating in the light down campaign.
|
|
2004 |
- Extended the scope of the ISO14001 certification. (Tokyo Head Office, Kansai branch, Chubu branch)
- Started participating in the Mount Fuji tree-planting festival.
- Obtained ISO14001 certification. (Shanghai Plant)
|
- ESCO business was introduced. (Toei Electric, Co., Ltd)
|
2005 |
- Held a dialogue with local residents regarding the environmental issues. (Head Office Plant)
- Granted an award for environment activities by Mishima-shi. (Toei Electric, Co., Ltd)
- Launched Cool Biz activity. (Tokyo Head Office)
|
- The process flow wastewater treatment plant facility was refurbished. (Sagami Plant)
- Thermal barrier coating was applied on the plant roof. (Plant No.7 at Sagami Plant)
- Recovery of the soil polluted with lead (Sagami Plant)
- Superhigh-efficiency transformer was installed. (Plant No.2 at Head Office Plant)
|
2006 |
- Established the 4th environment voluntary plan.
- Extended the scope of the ISO14001 certification. (Shibaura System)
- Accepted our employees’ families and local residents in the plant tour and provided environment-related information in the solution fair. (Head Office Plant)
|
- Superhigh-efficiency transformer and lighting equipment were installed. (New Plant No.9 at Head Office Plant)
- Elimination of asbestos (Plant No.7 at Sagami Plant)
- Thermal barrier coating was applied on the plant roof. (Toshiba Machine Molding Engineering)
- Started electricity demand monitoring. (Toei Electric, Co., Ltd)
- Superhigh-efficiency transformer and lighting equipment were installed. (New building at Head Office Plant)
- Superhigh-efficiency lighting equipment was installed. (Engineering building at Fujiseiki Corporation)
|
2007 |
- Accepted local residents in the plant tour and provided environment-related information in the solution fair. (Head Office Plant)
|
- Superhigh-efficiency transformer and lighting equipment were installed. (Engineering building at Sagami Plant)
- Superhigh-efficiency compressor was installed. (Fujiseiki Corporation)
- ESCO business was introduced. (Toshiba Machine Molding Engineering)
|
2008 |
- Granted “Kanagawa Global Environment” award. (Sagami Plant)
- Granted “12 years continuation” award by Japan Audit and Certification Organization for Environment and Quality.
|
- The soil polluted with cyanide stored underground was disposed of. (Head Office Plant)
- High-efficiency lighting equipment and transformer, and inverter fan were introduced. (Gotemba Plant)
- Human body sensor and timer switch were installed in lighting equipment. (Head Office Plant, Sagami Plant)
|
2009 |
- Won the Kanagawa Prefecture’s award for distinguished performance in environment conservation (Sagami Plant)
- Won the Grand Prix of the Electricity Use Rationalization Committee award. (Gotemba Plant)
|
- Two units of extra-high voltage transformer were consolidated into one. (Sagami Plant)
- Hot water storage kerosene boiler was replaced with small electric water heater. (Sagami Plant)
- Started disposal of high voltage capacitor which is PCB waste. (Head Office Plant)
|
2010 |
- Certified as “Shizuoka Miraino Mori Supporter”. (Toshiba Machine)
- Extended the 4th environment voluntary plan.
|
- Started replacing lighting equipment with LED.
|
2011 |
|
- Lighting equipment using solar and wind power was installed. (Head Office Plant)
- Started setting up green curtains.
|
2012 |
- Won the 3rd prize in organization section of the Numazu City’s green curtain photo contest. (Head Office Plant)
- Established the 5th environment voluntary plan.
- Extended the scope of the ISO14001 certification. (Tohoku branch, Takasaki office, Shizuoka office, Hiroshima office, Onomichi office)
- Obtained ISO14001 certification. (Chennai Plant in India)
|
- Started monitoring using a system for monitoring equipment and machines operation status. (Head Office Plant, Sagami Plant)
- Dilapidated facility (office for outside workers) was dismantled and the offices were consolidated. (Head Office Plant)
|
2013 |
- Started issuing “CSR Report”, a new title changed from “Environment Report”.
- Awarded as “excellent energy management operator” (Numazu Plant)
|
- High voltage capacitor which is PCB waste was disposed of. (Fujiseiki Corporation, Toei Electric, Co., Ltd)
|
2014 |
- Certified as “Shizuoka Miraino Mori Supporter”. (Shibaura Semtek Co., Ltd.
|
- High-efficiency compressor was introduced. (Numazu Plant, Sagami Plant)
- Ground water is used for cooling compressor. (Numazu Plant)
- Laser oil film detector was installed at the final outlet. (Numazu Plant, Gotemba Plant)
|
2015 |
- Obtained ISO14001 certification. (Thai Plant)
- Started calculation of the supply chain emissions.
- Established an environment action plan (with mid- to long-term objectives)
- Started No Car Day. (Numazu Plant)
|
|
2016 |
- Awarded for “contribution to Atsugi district waste measures conference (Sagami Plant)
- Started an environmental audit for overseas manufacturing subsidiaries.
|
- VOC removal equipment was installed (Shanghai Plant)
|
2017 |
- Won the governor’s award of the Shizuoka Prefecture global warming prevention activities. (Numazu Plant)
- Completed shifting to ISO14001:2015. (3 domestic and overseas plants)
|
- Solar power generation facility was installed. (Gotemba Plant)
|
2018 |
- Granted the gold prize of the 2018 industrial zone waste management award (Thai Plant)
|
- Fuel oil burner nozzle was improved. (Numazu Plant)
|
2019 |
|
- Replacement of the air compressor (Gotenba Plant)
|
2020 |
- Change of the company name from Toshiba Machine to Shibaura Machine
- Change of the environment structure from 15 divisions to 12 divisions as a result of the organizational change based on the management reform plan
|
- Consolidation of the number of low-frequency furnaces (Numazu Plant)
- Replacement of the technical ward air conditioners (Numazu Plant)
|
2021 |
|
- Replacement of the large turbo refrigeration machine (Numazu Plant)
- Replacement of ceiling lights of the factory to LED
|
2022 |
|
- Reduction of operating hours for large turbo chillers.(Numazu Plant)
- Conversion of plant ceiling lights to LED (Numazu Plant)
- Introduction of garbage disposer (Numazu Plant)
|
2023 |
- Support for the Task Force on Climate-related Financial Disclosures (TCFD) recommendations
- Participation in the Numazu City SDGs Promotion Partners
|
- Use of LEDs for the ceiling lightings in the Plant (Numazu Plant)
|